Monthly Project Status Report for the Period Ending September 30, 2009 The following report contains information and status of projects and activities as submitted by Physical Plant departments. The date in parentheses after the project listing is the anticipated completion date. · PROJECT LISTING KEY: Building prefix and location, project manager's initials, project description, status, and anticipated completion date (if known). Once a project is marked COMPLETED, TRANSFERRED TO ANOTHER AREA FOR COMPLETION, or CANCELED, it will be removed from the project list the following month. · PROJECT MANAGER KEY: Sarah Baynard (SB), Andy Nogueira (AN), Gregory See (GS), Vern Woodard (VW).
· (AN) Working on entrance sign made of brick and concrete block at the corner of Fletcher and Palm. (11/12/09) · (AN) Install signs (Use Dry Eraser Markers Only) near every white board in all classrooms. (10/01/09) COMPLETED · (GS) Multiple building’s interior classroom access. (03/31/10) B. Campus Building Projects in Order by Building Prefix:
ALC TRELLIS · (AN) Replace and repair rotten wood and paint columns. (11/15/09) Cancelled
BSF · (VW) Controls & HVAC upgrade project. (12/01/09) · (VW) Hot water reheat coils replacement. (12/01/09)
BSN · (AN) Sidewalk repairs between BSN/CPR. (11/01/09) COMPLETED
CAM · (AN) Repair sidewalk for ADA report. (10/30/09)
CIS · (GS) CPH fire alarm replacement. (01/15/10)
CPR · (GS) Card access addition for room 103. (11/30/09) · (AN) Recover 46 white boards in classrooms. Waiting on funding. (11/01/09) · (AN) Sidewalk repairs between BSN/CPR. (11/01/09) COMPLETED · (VW) Repair wall cracks. (12/01/09)
CWY · (AN) Repair damaged asphalt. (11/10/09)
CUT · (AN) Remediation of drywall (result of mildew). (10/01/09) COMPLETED · (AN) Remove mold from lobby and conference room walls. (10/01/09) COMPLETED
EDU · (AN) Install storm drain lines and cut in grills on west end and south end of EDU sidewalk. (10/01/09) COMPLETED · (AN) Install gutter over main entrance door. (10/28/09) · (VW) Replace VFD unit on air handler #2-1. (12/01/09)
ENB · (GS) Water proofing exterior of building. (09/20/09) COMPLETED
ENG · (AN) Seal deck and waterproof area.. (10/01/09) COMPLETED
FAH · (AN) Install 27 auditorium seats. Waiting on P.O. (12/21/09)
HMS · (AN) Install coating on floors and repair walls and doors. (09/11/09) COMPLETED · (AN) Refurbishing restrooms. Put on hold. (02/15/10) · (AN) Painting exterior of building. Put on hold. (04/30/10) · (VW) Replace motor starter for air handler #3. (12/01/09)
LIB · (AN) Roof replacement project. Working on sealing panels. (11/10/09)
LIF · (AN) Painting exterior of building. Put on hold. (04/30/10)
MDC · (VW) Install control air compressors in PH-1 and PH-2. (01/01/10)
MGX · (AN) Working on new roof design. Going out for bids on November 4. (12/31/09) · (AN) Painting exterior of building. Put on hold. (04/30/10)
NEC · (AN) Repair sidewalk in the patio area. (11/18/09)
PCD · (AN) Install 32 auditorium seats. Waiting on P.O. (12/21/09) · (AN) Painting of lobby and hallways. Put on hold. (10/30/09) · (AN) Repair clean-out. (11/13/09)
PHY · (AN) New roof design for replacement. Put on hold. (10/30/09)
REC · (AN) Refurbishing restrooms. Put on hold. (02/15/10) · (AN) Painting exterior of building. Put on hold. (04/30/10)
SCA · (AN) Painting exterior of building. Put on hold. (04/30/10) · (VW) Replace condensate pans in air handlers #4 and 5. (11/01/09)
SOC · (AN) Painting exterior of building. Put on hold. (04/30/10)
SVC · (AN) Refurbishing restrooms. Put on hold. (02/15/10)
USF · (AN) Roof study with Elements/CMS. (11/30/09)
II. ENERGY MANAGEMENT
· Natural Gas Purchase Savings The direct purchase of natural gas saved a total of $1,458,425 in FY 08-09 when compared with Peoples Gas price and avoided cost compared to FY 07-08. In FY 09-10 USF saved $52,093 in July ‘09, and $37,729 in August for a total of $89,822.05 in August ‘09. Total savings for the natural gas purchasing program stands at $9,274,004. Effective May 1, 2009, the University started purchasing natural gas on a fixed price basis. This is to ensure that USF achieves budgetary cost reduction for Purchased Utilities in comparison to FY07-08 in the purchase of natural gas. Fifty (50%) percent of the gas is being purchased on a 12 month price lock and 40% of the gas is being purchased on a 24 month price lock.
· Heat Pipes GLE consulting engineering firm has been issued PO to evaluate, design, and coordinate heat pipe installations in SCA, NES, and MDC buildings approved for installation. A total of 12 air handling units are in the project. Designs for a total of 6 units (2 each in SCA, NES, and MDC Ph 3) were completed and bid. These units were retrofitted prior to the start of Fall 2009 semester. The remaining 6 units (2 in SCA and 4 in MDC) will be retrofitted in December 2009. The bids for the remaining units have been received and are in the process of being awarded.
· Metering of St. Petersburg Campus Buildings Owned by USF Tampa Utility meters were installed on five buildings of the St. Petersburg campus which are owned by USF Tampa. Energy consumption reports for these buildings in relation to the rest of the St. Petersburg campus are being developed along with monitoring accuracy of the meters.
· LED Traffic Lights A total of 11 intersections are to be retrofitted with LED traffic lights. A total of 322 incandescent lamps to be replaced with LED lamps. The projected savings are 121,000 kWh/yr or $10,285/yr for a simple payback of 2.6 years. The project installation is underway and scheduled for completion in October 2009.
· Lighting Efficiency Improvement In-house maintenance staff has completed replacement of 32 watt fluorescent lamps with 28 watt lamps in the LIB. The remaining campus buildings have been divided into 11 lots, each with approximately 350,000 sq. ft. Each lot will be individually bid for installation work. Lot #1 (BSN, CPR, CIS, and ALC) was bid and awarded to Tamco Electric. Simultaneously, Lot #4 (FAD, FAH, FAS, TAT, TAR, THR, CAM, and PCD) and Lot #7 (STA, CWY, PED, REC, CRO, PEA, CPT, CRS, OPM, WSF, FPC, PPA, PPB, PPC, PPD, CPE, GES, GMS, WHB, WHD, ENL, and ENR) buildings are being converted by in-house staff. Lot #1 is 100% complete. Lot #2 is has been bid and awarded – Lot #2 includes SCA, BSF, CHE, NES, LIF, and LSA.
· Monthly Southwest Florida Water Management Well Report The well report for September 2009 has been filed.
III. GROUNDS AND VEHICLE MAINTENANCE · Assumed the grounds maintenance of Juniper-Popular Hall · Completed sodding at CWY · Completed employee key inventory · Completed safety training on Asbestos Awareness · Continued regular maintenance to campus grounds
IV. COORDINATION & SPECIAL SERVICES
· Getting second quotes for EOC radio repeater. · Met with Homecoming Committee for final plans for events for that week. · Final meeting for Diabetes Walk (2,200 expected to attend) is scheduled for 9/29/09. · Provided information about the event request process and examples of the form to EH&S to forward to Sarasota Campus.
Relocations/Moves · Diabetes Center move from the Clinics to MDF is complete. · MDF HR move is complete. · Relocated medical equipment from Heath Department in Punta Gorda to MDT.
V. UTILITIES
· CPT – Replace damaged high voltage (4160 v) Auto Transformer on #11 CARRIER 2300 ton chiller. COMPLETED · CPT – Perform bi-annual inspection and re-calibration to #5 Boiler high pressure steam safety relief valve. COMPLETED · CPT – Replace damaged Primary Control Transformer on #11 CARRIER 2300 ton chiller. COMPLETED · PCD – Replace damaged Light Pole and Coolie Hat fixture on the east side of the building. COMPLETED |